Lym Consults have executed over 100 process safety and risk management related projects, which consist from Deep Offshore Operations to Minor Onshore and Reservoir Development Projects.We have worked on various stages of project lifecycle – Concept Stage, Front End Engineering Design (FEED), Detailed Engineering Design (DED), Construction, Commissioning and Operations.

Lym Consults has vast experience in performing process safety and risk assessment studies for Shell operating companies. Shell Africa is Lym Consults’ largest single customer worldwide.
Lym Consults recently executed a two-year contract with SPDC covering Specialist Safety Studies for SPDC Production Assets. Also, another two-year contract with SPDC through Orona Nig. Coy (A Lym Consults’ Company) for General HSE Studies for SPDC Production Operations.  We have worked for Shell on a global platform in providing technical safety and risk engineering support, such as review and update of Makoko Abana Production Unit Operations HSE Case for Pecten Cameroon Company (Shell Cameroon now Addax Petroleum). As such, Lym Consults have mastery/expert skill of various international Specification, Procedures and Standards/Guidelines.Our Company has maintained proffering quality solutions to its Clients, and has made us Africa’s largest HSE Risk Management Company.

Our Projects experience is what clearly sets us apart from others.

“Nothing beats Experience”

Below is a summarized list of projects we have successfully executed and delivered for our clients

Project  Brief Description Client Date
UPS Crude Storage Tanks Construction & Rehabilitation Project:

  • HSE Case Development and Implementation,
 

Support HSE in Construction

AdanoEng/SPDC January 2007
 West African Gas Project (WAGP)

  • HSE Case Development
 

Support HSE in Construction

Lee

Engineering/SPDC

March 2007
Ovhor Further Oil Development (FOD) Project:

  • HSE Case Development,
 

Support HSE in Construction

 

SPDC

 

June 2007

Crude Oil and Fire water Tanks REHAB for Warri Refinery and Petrochemical Company (WRPC):

 

  • Hazards Analysis/Study,
  • HSE Hazard & Effect Register,
  • Project Execution Plan
 

 

 

Support HSE in Construction

 

Arthur

Ferdinand/WRPC

 

 

 

 

February  2008

Gbaran Ubie Integrated Oil and Gas  Project

  • Operations HSE Case
Develop Operations Readiness and operations assurance for GBU IOGP Shell Nigeria (SPDC) October, 2009
Gbaran Ubie Integrated Oil and Gas Project (Pipeline Scope)

  • Operations HSE Case
Develop Operations Readiness and operations assurance for GBU IOGP Saipem/SPDC August 2010
Bonny Crude Loading Platform

  • Offshore Operations HSE Case
Support Operations Readiness and Assurance for the CLP Shell Nigeria (SPDC) February 2010
Computerised Maintenance Management System (CMMS) for Bonny Crude Loading Platform Support Operations Readiness and Assurance for the CLP Shell Nigeria (SPDC) March 2010
Nembe Creek Trunk Line (NCTL)

  • Operations HSE Case
Develop Operations Readiness and operations assurance for NCTL Project Shell Nigeria (SPDC) March 2010
Gbaran Ubie Integrated Oil and Gas Project

  • Hazard and Effect Register – Low and Medium Risk Analysis
Develop Operations Hazard and

Effects Register for GBU IOGP

Operations

Shell Nigeria (SPDC) April 2010
Develop Operations HSE Case for Afiesere, Uzere, Kokori and Olomoro NGC Stations Support Operations Readiness and Assurance for 5 NGC Stations Shell Nigeria (SPDC) June 2010
Preparation of Operations HSE Case for Cawthorne Channel 1 and Awoba Flowstations Support Operations Readiness and Assurance for two (2) flowstations Shell Nigeria (SPDC) July 2010
Design HSE Case for Otumara Node Facilities (DOMGAS Project) Support Technical and Process

Safety in Design for Otumara Node

Facilities

Shell Nigera (SPDC) August 2010
Development of Operations HSE Case for West African Gas Projects (WAGP) Utorogu Node Support Operations Readiness and Assurance for WAGP Shell Nigeria (SPDC) October 2010
Design HSE Case for Alakiri NAG DomGas Project Support Technical and Process

Safety in Design for Alakiri Node Facilities

MAKON/SPDC

 

October 2010
Quantitative Risk Assessment (QRA) for Alakiri NAG Support Technical and Process

Safety in Design for Alakiri Node Facilities

MAKON/SPDC December 2010
Hazard Register for Alakiri NAG Support Technical and Process

Safety in Design for Alakiri Node Facilities

MAKON/SPDC December 2010
Noise Assessment and Mapping for Alakiri NAG Support Technical and Process

Safety in Design for Alakiri Node Facilities

MAKON/SPDC January 2011
Design HSE Case for Bonny AG Solution Support Technical and Process

Safety in Design for Bonny Node

Facilities

MAKON/SPDC January 2011
Review Batan Flowstation Operations HSE Case Support Operations Readiness and Assurance for BatanFlowstation Shell Nigeria (SPDC) November 2010
Review & Update Makoko Abana Production Unit (MAPU) Operations HSE Case for Pecten Cameroon Company (Shell Cameroon) Now Addax Cameroon

  • Offshore Operations HSE Case for 12 Offshore Platforms
Support Operations of Mokoko Abana Production Unit Pecten (Shell

Cameroon)

February 2011
Forcados Yokri Operations HSE Case – Onshore and Offshore.

  • Operations HSE Case for 5 Facilities
Support Operations Readiness and Assurance for FYIP Shell Nigeria (SPDC) July 2012
Technical Integrity Verification for Gbaran Ubie Infill Project Support Process Safety in Design NETCO/Shell

Nigeria

August 2011
Concurrent Operations Plan for Gbaran Ubie Infill Project Support Process Safety in Design NETCO/Shell

Nigeria

August 2011
Design HSE Case for Gbaran Ubie Infill Project Support Process Safety in Design NETCO/Shell

Nigeria

August 2011
Operations HSE Case for Bonny Associated Gas Solutions Project Support Operations Readiness and Assurance Shell Nigeria/Makon December 2011
Operations HSE Case for Santa Babara Flowstation Support Operations Readiness and Assurance Shell Nigeria December 2011
Design HSE Case for Agbada Non-Associated Gas Project Support Technical and Process Safety in Design Shell Nigeria/Makon December 2011
Construction HSE Case for Agbada Non-Associated Gas Project Support HSE in Construction Shell Nigeria/Makon December 2011
Quantitative Risk Assessment for Agbada Non-Associated Gas Project Support Process Safety in Design Shell

Nigeria/MAKON

December 2011
Dropped Object Assessment for Otumara Associated Gas Solution Support Process Safety in Design Shell

Nigeria/Daewoo

December 2011
Escape, Evacuation and Rescue Analysis for Otumara Associated Gas Solution Project Support Process Safety in Design Shell

Nigeria/Daewoo

December 2011
Safety Integrity Level Study for Otumara Associated Gas Solution Project Support Process Safety in Design Shell

Nigeria/Daewoo

January 2012
Operations HSE Case for Otumara Associated Gas Solution Project Support Process Safety in Design Shell

Nigeria/Daewoo

January 2012
Construction HSE Case for Forcados Yokri Integrated Project (FYIP) – Flare Down Project Support Safety in Construction Shell Nigeria/OPI June 2012
Human Factor Engineering for Otumara Associated Gas Project Support Process Safety in Design SPDC/Daewoo September 2012
Construction HSE Case for Otumara Associated Gas Solution Project Support Safety in Construction SPDC/Daewoo July 2012
Operations HSE Case for Utorogu Gas Handling Facilities Support HSE in Operate Phase SPDC/Makon May 2012
Operations HSE Case for Cawthorne Channel 2 Flowstation Support HSE in Operate Phase SPDC May 2012
Operations HSE Case for Cawthorne Channel 3 Flowstation Support HSE in Operate Phase SPDC Dec 2012
Operations HSE Case for Krakama Flowstation Support HSE in Operate Phase SPDC Dec 2012
Operations HSE Case for NGC (Escravos Beach) Station Support HSE in Operate Phase SPDC May 2012
Operations HSE Case for Alakiri Non-Associated Gas Plant Support HSE in Operate Phase SPDC/MAKON June 2012
Flare Radiation and Noise Assessment for Otumara Associated Gas Solution Project Support HSE in Design Phase SPDC/DAEWOO June 2012
Emissions Study Report for Otumara Associated Gas Solution Project Support HSE in Design Phase SPDC/DAEWOO June 2012
Quantitative Risk Assessment for Otumara Associated Gas Solution Project Support HSE in Design Phase SPDC/DAEWOO June 2012
Materials Selection and Corrosion Study Report for Otumara Associated Gas Solution Project Support Corrosion Risk Management SPDC/DAEWOO March 2012
Noise Level Assessment Report for Otumara Associated Gas Solution Project Support HSE in Design SPDC/DAEWOO September 2012
Safety Integrity Verification (SIL) for Otumara Associated Gas Support HSE in Design SPDC/DAEWOO June 2012
FIREPRAN for Otumara Associated Gas Solution Project Support HSE in Design SPDC/DAEWOO September 2011
Review & Update Offshore Gas Gathering System (OGGS) Operations HSE Case Support Technical and Process Safety in Operations SPDC July 2012
Quantitative Risk Assessment for Ughelli East Associated Gas Process Safety in Design Makon December 2012
Design HSE Case for Ughelli East Associated Gas Project Process Safety in Design Makon December 2012
Review and Update Operations HSE Case for Gbaran Ubie IOGP Process Safety in Design SPDC 2012
Quantitative Risk Assessment for Ughelli West Associated Gas Project Process Safety in Design Makon March 2013
Design HSE Case for Ughelli West Associated Gas Project Process Safety in Design Makon March 2013
Quantitative Risk Assessment for Utorogu Associated Gas Project Process Safety in Design Makon June 2013
Design HSE Case for  Utorogu Associated Gas Project Process Safety in Design Makon August 2013
Provision of Specialist Process-Technical Safety Services for SPDC (Shell Nigeria) Production Operations – 2 years Contract Process Safety in Operations SPDC Closed Out: December 2014
Operating Envelop Study of Pressure Reduction & Metering Station (PRMS) for Shell Nigeria Gas Process Safety in Operations Shell Nigeria Gas January 2014
Design HSE Case for Forcados Yokri Integrated Project (FYIP) – New Onshore Scope Project Process Safety in Design IMPaC/SPDC November 2013
Construction HSE Case for Soku Non-Associated Gas Compression Facilities Project Support Safety in Construct Phase Alcon/SPDC December 2013
Review Operations HSE Case for Sea Eagle (EA) FPSO Process Safety in Operations SPDC February 2015
Construction HSE Case for Ogbotobo Power System Revamp Project Support HSE in Construction SPDC/Lee Eng January 2014
Engineering Data Warehouse for Forcados Yokri Integrated Project (FYIP) – Offshore Scope Support Engineering SPDC June 2015
Engineering Data Warehouse for NLNG Support Engineering SPDC October 2013
Bowtie Analysis for Soku Gas Plant Process Safety in Operations SPDC June 2013
Bowtie Analysis Okoloma Gas Plant Process Safety in Operations SPDC June 2013
Bowtie Analysis SPDC NAG Plants Process Safety in Operations SPDC June 2013
Design HSE Case for Nembe IPP Process Safety in Design Lee Eng/SPDC Ongoing
Construction HSE Case for Nembe IPP Safety in Construction Lee Eng/SPDC Ongoing
Gbaran Security of Supply (SOS)

  • Construction HSE Case
Safety in Construction ALCON/SPDC August 2014
Operations HSE Case for Temporary Production Unit (TPU) Support Safety in Operations Addax Petroleum Nov. 2014
Review and Update of Offshore Gas Gathering System (OGGS) Operation HSE Case Support Safety in Operations SPDC Nov. 2014
Quantitative Risk Assessment (QRA) for Temporary Production Unit (TPU) Support Safety in Operations Addax Petroleum Dec. 2014
Hazard and Operability (HAZOP) for Temporary Production Unit (TPU) Support Safety in Operations Addax Petroleum Nov. 2014
API 14C Checklist Compliance Analysis for Temporary Production Unit (TPU) Support Safety in Operations Addax Petroleum Dec. 2014
Safety Critical Element (SCEs) Identification for TPU Support Safety in Operations Addax Petroleum Nov. 2014
Develop Performance Standards for Safety Critical Elements for TPU Support Safety in Operations Addax Petroleum Nov. 2014
Develop Bowties for Major Accidents Hazards for TPU Operations Support Safety in Operations Addax Petroleum Dec. 2014
Safety and Operability (SAFOP) for Egbema Associatde Gas Project Support Safety in Design Makon/SPDC Dec. 2014
Safety and Operability (SAFOP) for Egbema Non-Associated Gas Project Support Safety in Design Makon/NPDC Dec. 2014
Fire Protection Analysis (FIREPRAN) for Egbema Associated Gas Project Support Safety in Design Makon/SPDC Dec. 2014
Fire Protection Analysis (FIREPRAN) for Egbema Non-Associated Gas Project Support Safety in Design Makon/NPDC Dec. 2014
Fire and Gas Mapping for Egbema Non-Associated Gas Project Support Safety in Design Makon/NPDC August 2015
Fire and Gas Mapping for Egbema West Associated Gas Project Support Safety in Design Makon/SPDC August 2015
Integrated Quantitative Risk Assessment (QRA) for Egbema AG & NAG Facilities

 

Hazardous Area Classification for Egbema AG & NAG Projects

Support Safety in Design Makon/NPDC/SPDC Febuary 2015
Design Safety Case for Egbema Associated Gas Project Support Safety in Design Makon/NPDC April 2015
Design Safety Case for Egbema Non-Associated Gas Project Support Safety in Design Makon/NPDC April 2015
Pre-Start-Up Safety Review for Bonny NAG Minor Reservoir Development Project Support Safety in Commissioning SPDC March 2015
Energia Flowstation Operations HSE Case 2015 Support Safety in Operations Energia Limited Ongoing
HAZOP for Antan Project Support Safety in Design Addax Pet. Ongoing
API 14C Checklist Studies/Report for Antan Project Support Safety in Design Addax Pet. Ongoing
Perform QRA: Gas Dispersion Modelling, Fire and Gas

Explosion Studies for Antan Project

Support Safety in Design Addax Pet. Ongoing
Develop FIREPRAN for Antan Project Support Safety in Design

 

Addax Pet. Ongoing
Perform Escape, Evacuation and Rescue Analysis (EERA) for Antan Project Support Safety in Design Addax Pet. Ongoing
Fire and Gas Mapping for Antan Project Support Safety in Design Addax Pet. Ongoing
Develop Manual of Permitted Operations (MOPO) for Antan Project Support Safety in Design Addax Pet. Ongoing
Identify SCEs and Develop Performance Standards for Anatan Project Support Safety in Design Addax Pet. Ongoing
Conduct HAZID, Bowtie and Develop Risk Register for Antan Project Support Safety in Design Addax Pet. Ongoing
Develop Design Safety Case for Antan Support Safety in Design Addax Pet. Ongoing
Safety Integrity Level for Antan Project Support Safety in Design Addax Pet. Ongoing
Layer of Protection Analysis for Antan Project Support Safety in Design Addax Pet. Ongoing
Jones Creek Field

  • Review and Update Jones Creek Operations HSE Case,
  • Develop Escape, Evacuation and Rescue Analysis (EERA) for Jones Creek Operations,
  • Quantitative Risk Assessment (QRA) for Jones Creek Operations,
  • Conduct HAZOP for Jones Creek Operations,
  • Conduct HAZID for Jones Creek Operations,
  • Develop Bowtie Analysis for the Major Accident Hazards (MAHs)
Support Technical and Process Safety in Operations Neconde Energy Limited/NPDC April. 2016
Pre-StartUp Audit (PSUA) for Utorgu NAG 2 Project

  • Assessment of readiness of all equipment and instrumentation involved in the project execution, with the inclusion of proving the process, which requires gas introduction
  • Review of impact of add-on facilities (if any) for the integrated operate phase, close out of HAZOP actions, etc)
  • Review of the piping/pipeline (if in scope) preservation requirements for the extended period of inactivity, ahead of readiness of the facility for operations (preservation activities, Asset Team participation readiness for the preservation requirements, etc)
  • Asset Integrity verification
  • Completeness and readiness status for the Control room and other critical facilities
  • 2-yr operations spares availability covering the range of equipment in the Project scope
  • SOF covering the Project scope
  • Operational readiness and Operability requirements of all systems
Support Safety in Commissioning Makon Eng. & Tech Services/NPDC August. 2016
Provision of Lifting Study Case for Ogbotobo Flowstation Power System Revamp Project

  • Review the methodology to execute the lifting activity including sizing and positioning of lifting equipment
  • Review and Update Current Hazard Analysis and HSE Case to capture new activities introduced (i.e. Jackup Barge Operations etc.)
  • Review and update of the lifting study Report for approval
Support HSE in Construction Lee Engineering/SPDC Sept. 2016